china Cost Cast Iron Belt Pulley Spz Spb SPA manufacturers

Merchandise Description

V-belt pulley introduce:

V- belt pulley of distinct varieties ( in accordance to sort and width of belts). The materials used is forged iron EN-GJL-250 UNI EN 1561, and for only a number of types it is steel C45 E UNI EN 10083-1. They have a small prebore that can be machined  in accordance to  CZPT ers’ needs. Furthermore the most frequent types are CZPT also with taperlock bore.

V belt pulley specifications

·  European standards : 

    a) V-belt pulley for taper bushing: SPZ, SPA, SPB, SPC    

    b) Adjustable speed V-belt pulleys and variable speed pulleys              

    c) Flat belt pulleys and conveyor belt pulleys

·   American standard:  

    a) Sheaves for taper bushing: 3V, 5V, 8V     

    b) Sheaves for QD bushings: 3V, 5V, 8V    

    c) Sheaves for split taper bushing: 3V, 5V, 8V    

    d) Sheaves for 3L, 4L or A, and 5L or B belts: AK, AKH,2AK, 2AKH, BK,  BKH,2BK, 2BKH, 3BK    

    e) Adjustable sheaves: poly V-pulley, multi-pitch H, L, J, K and M

·   Bore: pilot bore, finish bore, taper bore, bore for QD bushing

·   Parts can be made according to drawings and/or samples

·  we can offer you the rang dimensions diameter 62MM~2000MM
  
 Prouducts show: 

  

  

  Our stock present
  
   

  
  

Our manufacture workshop

  

  

Packing show 

Catalogue

FAQ

Q1. What is your conditions of packing?
A: Typically, we pack CZPT merchandise in solitary shade box. If you have particular request about packing, pls negotiate with us in CZPT , we can pack the goods as your request.

Q2. What is your conditions of payment?
A: T/T 30% as deposit, and 70% just before shipping. We’ll demonstrate you the pictures of the goods and packages 
ahead of you pay the balance. CZPT payments terms, pls negotiate with us in CZPT , we can discuss.

Q3. What is your phrases of shipping?
A: EXW, FOB, CFR, CIF.

This fall. How about your delivery time?
A: Normally, it will take 25 to thirty days right after acquiring your CZPT payment. The specific supply time depends 
on the items and the amount of your get.

Q5. Can you produce according to the samples?
A: Indeed, we can generate by your samples or specialized drawings. We can develop the molds and fixtures.

Q6. What is your sample plan?
A: We can supply the sample if we have completely ready components in inventory, but the CZPT ers have to pay the sample value and 
the courier cost.We welcome sample get.

Q7. Do you take a look at all your goods before supply?
A: Sure, we have a hundred% take a look at before delivery

Q8: How do you make CZPT organization CZPT -phrase and great romantic relationship?
1. We keep good good quality and aggressive value to make sure CZPT CZPT ers reward
2. We regard each and every CZPT er as CZPT pal and we sincerely do business and make buddies with them, 
no subject the place they occur from.

 

china  Cost Cast Iron Belt Pulley Spz Spb SPA manufacturers